Subcontractor vs supplier
Traditionally, the distinction between a supplier and a subcontractor was that a supplier provided goods only, whereas a subcontractor provided goods and services.
However, this apparently clear distinction has become blurred by the increasing complexity of the construction supply chain and the emergence of practices such as off-site fabrication in which the provision of complex fabricated goods might include elements of construction work that would previously have been considered a service carried out by a subcontractor.
The UK government has now broadened the term ‘supplier’ to mean any ‘…provider of services or goods either directly to the employer or to another supplier in a supply chain’ (ref. PAS 1192-2 (now replaced by BS EN ISO 19650)).
This catch all definition includes; contractors, subcontractors, consultants, suppliers and service providers who might all now be described as ‘suppliers’.
[edit] Related articles on Designing Buildings
- Contractor.
- Contractor vs supplier.
- Domestic sub-contractor.
- Integrated supply team.
- Invoice.
- Named sub-contractor.
- Nominated sub-contractor
- PAS 1192-2.
- Procurement route.
- Products v goods v materials.
- Specialist contractors.
- Specialist subcontractor.
- Sub-consultant.
- Subcontractor.
- Supplier.
- Supplier selection.
- Supply chain.
- Supply chain management.
- Trade contractor.
- Works contractor.
Featured articles
Check out some of the best features and news from Designing Buildings as well as key stories from around the web.
Construction Management, 2 June
Construction deaths halve in two years.
Green Book changes to drive investment in all parts of UK.
Minimum energy efficiency standards (MEES)
CIAT briefing on response to consultations for privately rented non-domestic properties.
Connect, collaborate, shape the future
Registration now live for UK Construction Week Birmingham.
CIOB announces Saul Humphrey FCIOB as new President for 26/27 term.
A quick, simple, and zero-bills solution to prevent overheating.
The adaptive reuse of large industrial structures.
Promoting the circular economy by extending the life of buildings.
CIAT responds to Climate Change Committee report
An urgent wake-up call for both government and the built environment.
Construction Management, 24 June
FMB pilot aims to build pipeline of site-ready tradespeople.
A quick introduction.
CLC publishes Mental Health Joint Code of Practice.
A quick introduction to its uses and risks.